IDCDCiranians.global

Workstream · Phase 1

Site build and publishing

Platform. Owner: Engineering lead.

Status
In progress
Phase
1
Depends on
3
Unlocks
1

01Deliverables

  • Page builder, design system and Site Kit plugin
  • All master, area, country and city pages built into dist/
  • Publisher with plan, probe and draft publishing

02Acceptance

  • Owner approves rendered pages before anything is published

03Depends on

  • D1 Multisite set-up on iranians.global: subdirectory install, and the subsite paths in content/network/network.json Decided
  • D2 Names and paths of the area subsites Open
  • IR-WP-06 Locales, right-to-left layout, fonts and calendars Not started

04Unlocks

05Phase 1. Foundations

Exit: Owner approves rendered pages (light and dark, desktop and phone) for Heritage, Language, Learn and Tier 1 regions.